Day #12

Getting near the end of this build. Hope to sail the boat within the next week. Today, the deck hardware was installed. I hope to get the standing rigging and running rigging finished within a day or two. Today’s photos (below) show the deck hardware and I also switched out the 4” swing arm for a 5” swing arm. I think that will provide a better purchase on the sheets.